Heavy Highway Projects - New Structures
Pruner Road Demolition and Reconstruction
Location: Riddle, OR
Description: The reconstruction of the Pruner Road Bridge required the construction of a temporary work bridge on the east side of the main bridge. This project required shoring, pile driving, forming, installation of a waterline, and pouring a new deck.